Texas Eminent DomainProperty Owner Resources

Easement type

Pipeline Easements in Texas

The document a pipeline company sends is a first position, not a fixed one. On working land its terms frequently carry more value than the difference between two offers.

Fig. — Permanent strip and construction workspaceNot to scale

What a pipeline easement grants

A right to construct, operate, maintain, inspect, repair, replace and sometimes remove a pipeline within a defined strip, together with a right of access to reach it. You keep title. What you may do on the strip afterwards is set by the document.

Width, depth and workspace

Two widths matter: the permanent easement and the temporary construction easement alongside it. Depth of cover matters on cultivated ground, because shallow cover restricts what equipment can do above the line for as long as it is there.

Ask for both widths in writing

An offer quoting a fifty foot easement may come with a workspace that doubles the disturbed area during construction. Both belong in the compensation discussion.

Restrictions after construction

Typically no permanent structures, no trees, often no stored equipment, and limits on changing grade. These restrictions run with the land and appear in the title search when you sell.

Repair and restoration

Fences, gates, cattle guards, internal roads, terraces, drainage and pasture all need to be put back. Specify the standard, the timing and who decides when the work is acceptable, because a general promise to restore is difficult to enforce.

Future line rights

If the document permits additional lines within the same easement, a second pipe can follow without a further negotiation or, in some drafting, without further payment. This is one of the most consequential clauses in the agreement and one of the easiest to miss.

Related property types

What kind of land is affected?

Start with your situation

Where are you in the process?

Related resources

Read next

More Texas resources are on the way. New guides publish every week.

Common questions

About pipeline easements

Should I sign the easement they sent?

It is a starting position. Width, route, crossings, depth, repair, restrictions and future line rights are all negotiable terms.

How wide is a typical pipeline easement?

Commonly around fifty feet permanent, with a temporary construction workspace alongside. Confirm both figures from the document.

Can they put a second pipeline in later?

Only if the document allows it. Future line rights are a standard clause and worth addressing before signing.

What can I do on the strip afterwards?

Ordinary use is often permitted while building, tree planting and storage usually are not. The document controls.

Next step

Understand Your Property Situation

Read the easement terms alongside the price, because they are the same deal.

Get Help Understanding Your Situation